成人片男女做受在线观看,97精品久久天干天天蜜,国产成人亚洲精品在线看,狠狠做五月深爱婷婷天天综合

Your Position: Home > News > Activities

Installation and Daily Maintenance of Roots Pump of Oil Filter

2019/8/1??????view:

  In the operation, hoisting, installation, use and maintenance of equipment, the correct processing procedures must be strictly followed.

  Once improperly operated, the internal or external transmission parts and driving equipment of the pump may also cause serious damage to the human body. It is strictly forbidden to start the vacuum pump when the intake cover or exhaust cover of the pump and the refueling and discharging ports are dismantled. If we want to check or maintain the moving parts of the pump, we must first completely cut off and lock the control power equipment.

  Higher temperature on the surface of roots pump housing and connecting pipes and accessories may cause injury when human body contacts.

  1.Dismantling and hoisting

  1.If the pump is packed in wooden cases, care should be taken not to touch the shell of the pump when it is unpacked.

  2.If the pump does not have a lifting ring, it must be lifted with hemp rope at the front and rear end caps of the pump or carried by forklift truck.

  2.Installation site:

  Roots vacuum pump should be installed in bright, dust-free and well ventilated buildings.

  The installation environment temperature of Roots vacuum pump is 5-40 C.

  There should be enough room around Roots vacuum pump for routine inspection, maintenance, disassembly and assembly.

  3.Fondation works:

  Roots vacuum pump can be installed on the same rack as the front pump to form a unit and then installed on the concrete foundation. Large pumps can be installed on the cement foundation separately, and the reserved holes of foundation bolts can be watered with concrete.

  According to the weight of Roots vacuum pump and the pressure resistance of foundation, the compressive area and depth of concrete foundation are determined.

  In order to bury foundation bolts in concrete, sufficient voids must be left out according to the location of foundation holes when concrete foundation is poured.

  The base surface must be horizontal.

  4.Installation:

  Wood frame is made according to the position of bottom foot hole of pump or unit. The foundation bolt is fixed on the wooden frame, placed in the reserved hole, and then concrete is poured into the reserved hole, placed for several days, and the wooden frame is removed after concrete hardening.

  The roots vacuum pump is put on the foundation, the level is calibrated with a level meter, the uneven part is hardened with metal gaskets, the foundation bolts are tightened, and the bottom cracks are filled with cement.

  5. Pipeline installation:

  Notes: If welding slag and other foreign matter enter the pump during pipeline installation, Roots pump and front pump will be met.

  Cause serious damage or damage, once similar situation occurs, the pipeline and pump must be strictly cleaned up.

  There are no foreign bodies such as welding slag and impurities in the intake and outlet gas pipelines, which have sufficient channel capacity.

  A flexible hose should be installed in the connecting pipe between the outlet of Roots vacuum pump and the inlet of the front stage pump to reduce the influence of vibration of the front stage pump on the Roots vacuum pump.

  In order to shorten the pre-pumping time, besides connecting the inlet of the front pump with the outlet of Roots vacuum pump, bypass pre-pumping pipes and valves can also be installed in the general system.

  In order to prevent the return of oil or water when the front pump stops (when the front pump adopts water ring vacuum pump), the exhaust valve or check valve should be installed on the inlet pipe of the front pump.

  The connection flange of the pipeline is sealed with O-type rubber sealing ring and coated with vacuum coke grease. The whole vacuum system must be sealed without leakage.

  If the pipeline is too heavy, it must be properly supported. In order to avoid affecting the normal operation of the pump

  Vacuum pumps equipped with cooling water shall be equipped with adjusting valves on the pipes at the cooling water inlet in order to control the amount of water.

  6. Installation of electrical equipment:

  Roots vacuum pump can only work within the prescribed inlet pressure range. When the current stage pump stops working, Roots vacuum pump must stop working at the same time. Therefore, electrical equipment must have interlocking and necessary automatic overload and overheating protection devices.

  The wiring of the motor must make the steering of the pump in the direction indicated by the arrow.

  Small pumps can start directly. Large pumps should be equipped with starters, such as pressure-reducing starter.


亚洲欧洲精品中文字幕在线| 国产精品盗摄一区二区三区 | 欧洲精品码一区二区三区免费看| 色婷婷久久亚洲综合看片| 日韩一区二区欧美一区二区| 久久久久久精品国产夫妻| 国产一区二区三区精品视频| 88av在线观看黄色片| 日韩一区二区三区高清视频| 国产精品国产三级在线观看| 色综合天天综合网国产成人网| 久久久久久精品天堂无码| 国产精品一区二区av白| 老子影院午夜伦不卡观看| 欧美 亚洲色图一区二区| 亚洲日韩欧美制丝袜国产| 免费看黄片一区二区三区| 日本三级加勒比在线观看| 久章草在线高清视频精品| 国产成人亚洲精品无码h在线| 91精产品一区一区三区| 欧美国产在精品视频观看| 国产漂亮美美女在线播放| 天天日天天色天天干天天| 久久久精品中出内射少妇| 亚洲中文字幕av天堂自拍| 91人妻午夜黄片免费看| 蜜臀久久99精品久久久久久| 亚洲精品资源网在线观看| 国产盗摄360破解在线| 国产精品18久久久久久不卡| 99这里有精品在线观看| 在线看国产不卡无码视频| 亚洲va熟妇自拍无码区| 久久久18禁一区二区网| 久久精品码二区| 国产在线打屁股调教网站| 免费无码高潮又爽又久久| 天天做夜夜做久久做狠狠| 国产精品色多多在线观看| 亚洲国产成人精品无码区99 |