成人片男女做受在线观看,97精品久久天干天天蜜,国产成人亚洲精品在线看,狠狠做五月深爱婷婷天天综合

Your Position: Home > Support > Service Center

Notes for reuse of Lyboa pump of ZYD transformer oil filter

2019/8/1??????view:

  The pump must be stored in a dry place before it returns to the workplace again. Better at room temperature (200C). Before the pump is withdrawn from the workplace, it should be removed from the vacuum system, washed with dry nitrogen and replaced with oil. The inlet and outlet of the pump must be sealed with the shipping seals at the time of delivery. The gas town must be closed. If the pump is idle for a long time, it should be sealed with plastic bags and desiccant.

  If the pump has been idle for more than a year, it must be maintained in a standard way and oil must be changed before the pump is put into operation again. We recommend that you contact the LEYBOLD manufacturer for maintenance services.

  Standard pumps are not suitable for installation in explosive dangerous areas. Please contact us when you intend to apply this method. Before installing the pump, it must be reliably disconnected from the power supply in order to prevent accidental start-up of the pump. Pumps can only be installed by qualified and well trained personnel. All safety regulations should be observed.

  Installation of ZYD oil filter Lyboa pump for reuse:

  In order to ensure safe start-up, it is necessary to proceed step by step according to the following instructions.

  The start-up can only be carried out by trained full-time personnel.

  SOGEVAC can be installed on any flat, horizontal plane. Under the four legs, there are metric threaded holes for fixing pumps.

  If the pump is inclined, the oil level can not be correctly read out. The pump is in danger of running dry.

  According to the different use of oil, the ambient temperature of the pump should be between 12 (55) and 40 (104). By improving the pump or replacing different types of oil, the pump can operate at lower ambient temperature. Please consult us about these questions.

  In order to ensure a good cooling of the pump, there should be enough space in the intake and exhaust outlets for maintenance and repair. Make sure the motor air intake is clean and clean.

  1. Connect to the system

  Standard pumps are not suitable for installation in explosive dangerous areas. When you plan to do so, please consult us. Before installing the pump, it must be reliably cut off from the power supply to prevent unintentional starting of the pump. The pump can only be installed by qualified and trained professionals.

  Comply with all safety regulations.

  2. Inlet side

  The intake flange of the pump is connected by internal threads. The pump can be connected to the vacuum system with suitable connectors.

  The cross section of the intake pipe should be at least the same as that of the intake port. If the intake pipe diameter is too small, the pumping speed will be reduced.

  We recommend using LOCTITE or TEFLON tape for threaded joints to ensure vacuum sealing. (especially when dangerous gases)

  3. Installation Warning of ZYD Oil Filter Lyboa Pump

  The pump should be connected to the intake pipe without any stress. Hose or pipe fittings are used in intake and exhaust pipes for easy removal during pump maintenance.

  - The maximum import pressure shall not exceed atmospheric pressure (about 1013 mbar). When there is excessive pressure in the import, the pump shall not be started.

  - The type of material used in the installation of pipes should take into account the type of gas pumped. The same is true for seals.

  If the process gas contains dust, dust filters must be installed in addition to random dust filters. We recommend that dust filters be installed horizontally with tees (3/13) or elbows (3/14). This ensures that no dust particles fall into the intake when the filter is removed. Import filters with different filter elements. Metal filter can prevent solid particles such as paper and plastics from entering the pump; paper filter can remove small particles such as dust and powder less than 1 micron; activated carbon filter can absorb chemical vapor such as acid and solvent. If the activated carbon filter is stored in a humid place, it should be dried at 212 for 2 hours before use.

  When extracting steam, we recommend installing condensers at the inlet and outlet sides.

  When pumping dangerous gas, the intake pipe must be tight.

  Solid particles or liquids are never allowed to enter the pump.


亚洲图片 欧美专区 自拍| 午夜亚洲精品专区高潮日| av免费高清网址在线播放| 欧美sss一区二区三区| 999国内精品视频免费| 亚洲日韩乱码人人爽人人澡人| 西西裸体a级午夜人体大| 精品中文字幕久久久久人妻| 99久久国产精品人妻无码| 国产午夜亚洲精品羞羞答答| 全亚洲最大黄色在线网站| 亚洲成在线观看无码不卡| 在线观看男人操女人网站| 中文字幕欧美人妻精品区| 欧美在线香蕉在线现视频| 国产99久久久久久久久久| 久久国产精品伊人青青草| 欧美日韩亚洲精品国产色| 日本精品区二区三区高清| 青青青娱乐精品视频在线| 国产欧美国产精品第一区| 青娱乐在线视频精品盛宴| 欧美日韩一区二区免费高清| 好了av电影免费在线观看| 一起草在线免费观看视频| 无码精品a动漫成人影院| 欧美亚洲国产精品中文字幕| 区一区二日韩精品免费观看| 熟女少妇中出一区二区三区 | 亚洲熟女自拍1| 午夜电影哗啦啦在线观看| 国产精品一区二区三区日韩| 国产色视频无码网站免费| 欧美精品精品一区在线发布| 日韩精品在线观看一二三区| 国产精品无码aⅴ嫩草| 精品国产18久久久久久| 性无码专区无码| 国产在线高潮流白浆视频| 久久九九综合精品国产首页| 精品久久成人免费第三区|